Risk Profile

Volusia County

East · Pop. 570,000 · Daytona Beach, Deltona

Volusia County has moderate structural risk. Some factors favor data center development, others work against it.

Data Center Risk
54/100
Moderate

Why this score?

Four weighted factors drive the Volusia County risk score. Methodology is fully documented — each input is public data or a reasoned proxy.

Power availability
27/30

Major in-county power generation (≥1,500 MW). Developers can site hyperscale campuses next to existing plants.

Water capacity
12/15

St. Johns River WMD — mixed urban/rural, moderate capacity.

Land availability
5/15

Urban/suburban mix. Few large parcels, mostly developed.

Current exposure
10/40

No direct adjacency, but known projects within the broader region.

Water infrastructure

Any hyperscale data center in Volusia County would need a consumptive use permit from the St. Johns River Water Management District.

The St. Johns River Water Management District covers 23% of Florida's land area and serves roughly 4.7 million residents across northeast and east-central Florida. Average daily water use hit 1.49 billion gallons in 2023. The district declared a Phase 1 Moderate Water Shortage in February 2026 affecting parts of Alachua, Baker, Bradford, Marion, and all of Duval County.

A single hyperscale data center using evaporative cooling can require 1–5 million gallons per day. With the district under an active Phase 1 Water Shortage declaration in early 2026, any new consumptive use permit for millions of gallons per day faces a much higher bar than in a normal water year.

Electric infrastructure

Grid capacity and transmission access are the single biggest driver of where hyperscale developers actually site projects.

Volusia County is served by Florida Power & Light as the primary electric utility, with Duke Energy Florida covering rural and cooperative-served areas. Home to Daytona Beach and NASCAR; mixed urban-rural.

FPL is Florida's largest investor-owned utility with the deepest transmission infrastructure for large industrial loads. Adequate power availability is rarely the bottleneck in FPL territory — permitting, siting, and community opposition usually are.

State legislative context

Florida's 2026 legislative session produced the regulatory framework that will shape every data center proposal in the state, including any that may come to Volusia County.

Florida's 2026 legislative session produced multiple bills that directly affect how data centers can be sited and permitted statewide, including in Volusia County. HB 1007 and SB 484 both propose restrictions on hyperscale data center siting, mandatory impact studies, minimum setbacks from residential areas and schools, and water-use disclosure requirements. Neither bill bans data centers outright — they raise the procedural bar. Some versions would allow economic development agencies to shield the end-user identity of a project for up to 12 months after filing, a provision that has already been used at projects like Project Tango in Palm Beach County.

What you can do

No active data center in Volusia County — yet.

Palm Beach got four days notice before their first zoning vote. Polk County approved Fort Meade's 4.4M-sq-ft complex on April 15. What they did, you can do — but only if you're ready before the proposal lands.

Your Volusia County Defense Kit is built now for your specific address and your concerns — your family's health (diesel backup generators, air quality), your well or municipal water, the 24/7 industrial noise and light, your property value, your electricity bill. It includes a Preparation Brief for your property in Volusia County, a pre-drafted public comment letter in your voice you can deploy same-day, a 2-minute hearing script, the Volusia County commissioners and Planning Department contacts, your Florida Water Management District, and what SB 484 and HB 1007 protect in your property rights.

$39. Delivered in 60 seconds. Permanent 180-day link — pull it up the minute you see a proposal in the news.

Get Your Volusia County Defense Kit — $39

Not legal advice. Written by AI trained on Florida public records, Sunshine Law, SB 484, HB 1007, and documented data center cases from Newton County GA, Mansfield GA, and Bessemer AL.